GROUTING WIDE CRACKS
IN A TROUBLE-FREE APPLICATION

AT 2 Hours 45 minutes FROM START
Large PLOT 2-45.gif - 13283 Bytes

Refusal has been reached.

SUMMARY OF APPLICATION SO FAR - at 2 hours 45 minutes:
Permeability before grouting is more than 100 lugeons (high)
Water:cement ratio = 0.5:1. Pressure has built up to 50 psi [3.5 bars] and is now fully under the control of the standpipe valve.
Total cement injected so far

To proceed to the next period in the simulation CLICK HERE.

If you wish to return to some of the previous periods, CLICK HERE.for a list of them, and for links.